2 INCH POLE MOUNT.............................................................................................SECTION 1
12 INCH MOUNTING KIT.........................................................................................SECTION 6
2 INCH POLE MOUNT SECTION 1
The standard mount kit consists of the following parts:
4 two inch U-Bolts
4 U-bold washers
8 7/16 inch nuts
These instructions follow installation on a building parapet often found at commercial sites. The material list reflects this type of installation. If sinking a pole in the ground, a U-Channel sign pole might be more secure.
Other materials needed
1 -Eight foot 1-7/8” Galvanized Chain link fence pole. This seems to be the cheapest, lightest, and most efficient material for a mounting pole. Available at any Home Depot. About $20.00 for an 8’ pole.
About 4’ of 3/8” commercial All-Strut
Polyurethane caulking
Flat Washers
Tap-Con 1-1/2” Fasteners for stucco or masonry
3-1-1/2” Strut Pipe Clamps
Step 1: Securing pole to Roof Parapet
Cut All-Strut pieces to length. Three pieces ensure a robust connection to the parapet that can sustain gusty winds.
Attach All-Strut pieces to the parapet using the Tap-Con fasteners. Note: It is very important, when penetrating a roof parapet with fasteners, that you put a dab of polyurethane caulking under the screws before sending them home to ensure a positive water seal, especially if the substrate material is stucco. This is critical; an ounce of prevention is worth a ton of cure here.
Attache the strut pipe clamps to the struts and run the pole through them. Secure the pipe clamps for a tight fit.
Step 2: Assemble solar panel and bracket
Hardware and instructions are included in the solar bracket box, also shown here.
Step 3: Attach equipment to the pole
Pass the u-bolts through the mounting holes on the Repeater box and the solar mounting bracket. Add the u-bold washers then the nuts. Tighten nuts until secure. Make sure the panel and Tehama box are aligned and the panel provides as much shade as possible to the Tehama box.
Loosen the strut pipe clamps so you can rotate the pole assembly. Rotate the pole so the solar panel is facing due South. Using a phone compass is recommended. Re-secure the strut pipe clamps.
The advantages of a roof installation are immense, this really abates nearly all RF interference issues, especially if going across large parking lots.
Finished Repeater, ground view:
Notes
A big chunk of the labor time is getting everything up to the roof, especially when working solo. You will want to use both hands when climbing typical roof access ladders. It’s often necessary to climb the roof then send down rope to tie off a bucket with tools and material, ladders, and the repeater. It takes a few trips up and down the roof access ladder to do so. A helper would be most efficient if one is available.
Figure about 3 – 6 hours for this type of installation, including the time is devoted to schlepping tools and material up a high roof.
12 INCH MOUNTING KIT SECTION 2
The 12 inch mounting kit contains the following parts:
4 cut strut pieces
8 square no-spin strut washers
8 strut nuts and
8 nulock nuts
8 Centering washers
16 bolts
4 36 inch band clamps
Tools needed:
#3 Philips screw driver
7/16” open ended wrench
Step 1
With each strut piece, take a pair of bolts, unlock nuts, and centering washers and attach the strut pieces to the Repeater box and the solar mount arm.
Step 2
With a pair of bolts, square washers, and strut nuts, mount the washers on the strut rail.
Step 3
Run the band clamps through the strut channel and around the mounting pole. Tighten the band clamp. Always place the solar panel right above the Repeater box to protect the repeater from the heat of direct sunlight.